Exercise 43: Crossing the Humber Estuary

Crossing the Humber Estuary

Read the text and choose the correct heading for each paragraph from the list of headings below. There are more headings than paragraphs, so you will not use all of them. You cannot use any heading more than once.

Matching Headings (Questions 15-20)

List of Headings

A Why the ferry crossing has always been difficult
B Building the bridge
C An advantage of the design for the bridge
D The growing popularity of the bridge
E Opposition to building a bridge
F Benefits and disadvantages the Humber has brought
G Proposed alternatives to ferry services
H How the bridge has contributed to the region's growth

Paragraphs

Paragraph I
For thousands of years, the Humber - an estuary formed where two major rivers, the Trent and the Ouse, meet - has been an obstacle to communications along the east coast of England, between the counties of Yorkshire to the north and Lincolnshire to the south. Before the arrival of the railways in the 19th century, water transportation was the most efficient means of moving heavy or bulk freight, and the Humber, situated at the heart of the waterway system associated with the two major rivers, was one of the chief highways of England. Its traffic brought prosperity to the settlements on its banks, particularly the city of Hull on its north bank, but the river itself tended to cut them off from some of their closest neighbours, as well as obstructing the progress of travellers moving north or south.
Paragraph II
The bridge was the outcome of over 100 years of campaigning by local interests for the construction of a bridge or tunnel across the estuary. The first major crossing proposal was a tunnel scheme in 1872. This scheme was promoted by Hull merchants and businesses dissatisfied with the service provided by the New Holland ferry crossing. Over the next 100 years, a variety of proposals were put forward in an effort to bridge the Humber. In 1928, a plan was drawn up by Hull City Council to build a multi-span bridge four miles west of Hull. However, the scheme was dropped after being hit by the financial woes of the Great Depression of the late 1920s and early 1930s.
Paragraph III
Government approval for the construction of a suspension bridge was finally granted in 1959, although it was not until 1973 that work finally began. The reasons why a suspension bridge was chosen were twofold. Firstly, the Humber has a shifting bed, and the navigable channel along which a craft can travel is always changing; a suspension bridge with no support piers in mid-stream would not obstruct the estuary. Secondly, because of the geology and topography of the area, the cost of constructing a tunnel would have been excessive.
Paragraph IV
Work on the construction proceeded for eight years, during which time many thousands of tonnes of steel and concrete were used and upwards of one thousand workers and staff were employed at times of peak activity. The designers had been responsible for two other major suspension bridges in Britain but, with a total span of 2,220 m, or almost a mile and a half, the Humber was going to be the longest suspension bridge in the world. Nowadays designers have computers, but back then everything was done with slide rules and calculators. The towers were concrete rather than the usual steel, since concrete was cheaper and would blend in better with the setting. The bridge was designed to stand for 120 years.
Paragraph V
Malcolm Stockwell, the bridgemaster, recalls that when the bridge first opened, there wasn't a great deal of interest in it. Then children started visiting, and he remembers their astonishment at seeing the control room and all the lights. People who lived in towns on opposite banks a mile apart started crossing the river - a journey that previously might as well have been to the moon. The bridge brought them together.
Paragraph VI
The bridge opened up, both socially and economically, two previously remote and insular areas of England, and the improvement in communication enabled the area to realise its potential in commercial, industrial and tourist development. The bridge has saved many millions of vehicle miles and many valuable hours of drivers' and passengers' time - an important factor not only for the drivers and operators of commercial vehicles, but also for tourists and holidaymakers who would have had to travel around the estuary to reach destinations in the region. In the words of Malcolm Stockwell, 'Although it can't beat the Golden Gate Bridge in San Francisco for setting, it far outstrips it for sheer elegance and as a piece of engineering.'